However, as Péter Szilágyi explained during the call, the Muir Glacier hard fork is likely to take place on January 04, 2020. The exact date is subject to change due to variable block times and timezones. ... Video: A visualization of the annual Arctic sea ice "minimum" for each year from 1979 through 2020. According to the official announcement from the company, Ethereum’s newest upgrade is called Muir Glacier and will take place at block number 9,200,000, which should be on January 1st, 2020. Alaska’s Muir Glacier, like many Alaskan glaciers, has retreated and thinned dramatically since the 19th century. The Muir Glacier network upgrade (hard fork) was activated at block number 9,200,000 on Jan 2, 2020, with one Ethereum Improvement Proposal (EIP). Ethereum Muir Glacier Upgrade Announcement The Ethereum network will be undergoing a scheduled upgrade at block number 9,200,000, which is predicted to occur on Wednesday, January 1, 2020. Due to a difficulty upgrade in a few days, the exact date is not yet exactly predictable. Muir Glacier 2020-01-01 9,200,000 Berlin (planned) TBD TBD ETH 2.0 Phase 0 (planned) 2020-12-01 TBD ETH 2.0 Phase 1 (planned) TBD TBD ETH 2.0 Phase 2 (planned) TBD TBD Several codenamed prototypes of the Ethereum platform were developed by the Ethereum Foundation as part of their Proof-of-Concept series. This approaching upgrade is known as Muir Glacier, and it is meant to activate on the Ethereum Mainnet at block number 9,200,000. The Muir Glacier hard fork network upgrade was activated on 2 January 2020 at block number 9,200,200 with a single Ethereum Improvement Proposal (EIP). The activation of the Muir Glacier hard fork is planned for block number 9.069.00. This upgrade would be in addition to the just-conducted Ethereum Istanbul Hard Fork. A Comprehensive Update on Ethereum’s Muir Glacier by Toshendra Kumar Sharma Ethereum welcomed the new year 2020 in the best possible way- with a network upgrade. Muir Glacier To Start 2020. Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube. An explanation of the Ethereum Muir Glacier Hard Fork, scheduled to take place on January 2nd, 2020. Video: Annual Arctic sea ice minimum 1979-2020 with area graph EIP 2384 effectively delays the difficulty bomb for another 4,000,000 blocks (~611 days). The Ethereum Network update「Muir Glacier」 9,200,000 Blocks (UTC January 2, 2020, 6:00 — January 3, 2020, 4:30 *expected) The duration will … However, the date might change due to variable block times and timezones. Ethereum Foundation announces that the network will undergo a new block upgrade, Muir Glacier, on Wednesday, January 1, 2020. Muir’s love of nature was unquestioned, and he devoted his life to its preservation.